Friday, 5 August 2016

Improvements

July 1st, 2012

August 2nd, 2016

Making a little progress! 🙂

Monday, 1 August 2016

We're Nearly Done the Front

The front of the LBH is almost finished (painting the exterior that is). You can see that there's still tape around the door, as I've got another coat of our fitting "Aspen Bark" to add. Also, the trim on the L-shaped nook is only primed. It won't be staying that Too Bright White you see there. And, bay window trim & soffits haven't even been sanded yet... Whew!

She is coming along nicely though. Tomorrow, we are going to work on the south wall where the overhead electrical wire comes into the house. BC Hydro is going to disconnect the power for the day, so we don't have to worry about electrocution. That's a relief. :)

Check out the soffits!

Thursday, 21 July 2016

Painting Pics!

Here are some more photos of the painting going on at the LBH. I'd say we are about 80% done!

Here is what we were up against, quite literally...

We used a product called Lead Out by Blue Bear (formerly Franmar). This is great stuff that when properly applied to lead paint, reacts to convert it to non-hazardous lead sulphide. I'd recommend it to anyone. It was expensive, especially to a Yukoner, but cheaper than going crazy like those poor Romans...

After applying the stripper, we wrapped the house in plastic to let it blister in the sun, as the Violent Femmes would say...

Then we unwrapped one wall at a time, and scraped the paint off. The coved part of the siding was tricky, so my husband suggested spoons. A couple of old ones did the trick. Our arms felt noodle-like the following day. 

Me!

Almost finished scraping the last wall...

While I started priming and painting the north wall, my husband set to work with the orbital sander and sanding blocks fashioned to fit in the coved siding. Before priming:

After priming:

After painting the north wall (left side of house) and large front wall:

Jeff and Riley, our Irish Terrier!

That's where we are at now. Our trusty carpenter has just added several new pieces of primed siding and some trim (much of the old corner trim was rotten where it was contacting the earth).

Next, we will paint those bits and the remaining walls, trim, soffits, etc.

I am keen to get this project finished!

Monday, 18 July 2016

New Blue!

We are getting close to being finished with painting. If you've ever painted a house, you will understand that the work is all in the preparation. It's especially so when you have 118 years of lead paint removal to deal with!

We have completed the north wall, minus a few pieces of new siding that will be installed (removed due to rot when the foundation was redone). We also completed the main front wall of the house. I will post more pics in the coming week. It was precarious work. 

The two walls in the corner "L" are primed and ready for the new blue. The south wall, which was the most weather damaged, has been sanded. We still haven't done any trim or soffits...

How does it look so far?

Wednesday, 8 June 2016

Tuesday, 7 June 2016

I Painted the Addition...

Perhaps you saw my last post with the photo... Well, painting is underway at the LBH! I spent 3 straight days painting last week, in between rain showers. I really had just one delay, and the weather was fine for painting.

Here's the fresh first coat on the north wall of the addition! The only annoyance during this time was the mosquitos trying to attack me, of course because I was a sitting duck.


I call this section the Two Hour Wall. It's nearly 27 feet long, with a couple of windows and a big water tank in the way. (I guess I'll have to wait until we drain the water in the fall to get to that pesky bit.)


This is the side entrance, on  the weathered south side of the LBH. It's the door that we use all of the time. It was tricky simply because of the door, awning and window. At this point I was feeling very pleased with myself, and the colour was drying into a gorgeous blue (thank you, Benjamin Moore)! Then it occurred to me that this was only the first coat. A great first day, however!


On the second day, I completed the north wall...


And I completed the Two Hour Wall...


And then I finished the second coat on this part of the south side...


It does look kind of weird, with both the old and new, and not to mention the awkward upper bit of the addition that I left unpainted! My husband and I agreed that we'd tackle that part together when we paint the original LBH in July. Since I was working alone, it might have been a little sketchy on the big ladder way up there. We are going to borrow some scaffolding for the next part of the job. You can really see how weathered this side of the house is. I have my flakes of old paint in a sandwich bag, and the lead testing kit I ordered finally came in, so I am going to get it tomorrow. I am pretty sure that old paint will have some nasty lead in it.


I was able to paint most of the trim on the addition, too, with the notable exception of the awning. We are considering a tricolour scheme there, to mirror the panels under the bay window.

Unfortunately, our contractor is ill, so we are anticipating a delay in the installation of the lower pieces of coved siding and new corner/trim boards around the front (old) part of the house. Until they're installed, I don't know if we should go ahead and paint! We will think on it some more, but you know how it is when you've already arranged for time off in your schedule to complete a task... I'll bet we end up just going ahead with it! We can add a few more pieces of siding afterwards, right?

Thursday, 2 June 2016

Sneaky Peeky

Here's a hint about what we've started... Oh, and we've such a long way to go!